THE SUBDIVISION MAP ACT

(California Government Code)

DIVISION 2. SUBDIVISIONS

Additions and deletions to the code sections for 1998, 1999 and 2000 have been noted in the text. Additions (with the exception of section numbers and headings) are noted by bold-faced type, while asterisks (***) denote the deletion of punctuation, words, phrases, sentences, or paragraphs.

 

Chapter 4. Requirements

(Sections 66473 to 66498)

Article 1. General
Article 2. Advisory Agencies
Article 3. Dedications
Article 3.5. Public Access to Public Resources
Article 4. Reservations
Article 5. Fees
Article 6. Reimbursement
Article 7. Soils Report
Article 8. Taxes and Assessments
Article 9. Monuments

 

Article 1. General

 

66473. Conditions for approval/disapproval: finding required

A local agency shall disapprove a map for failure to meet or perform any of the requirements or conditions imposed by this division or local ordinance enacted pursuant thereto; provided that a final map shall be disapproved only for failure to meet or perform requirements or conditions which were applicable to the subdivision at the time of approval of the tentative map; and provided further that such disapproval shall be accompanied by a finding identifying the requirements or conditions which have not been met or performed. Such local ordinance shall include, but need not be limited to, a procedure for waiver of the provisions of this section when the failure of the map is the result of a technical and inadvertent error which, in the determination of the local agency, does not materially affect the validity of the map.

(Amended by Stats. 1976, Ch. 21.)

 

6473.1. Energy conservation

The design of a subdivision for which a tentative map is required pursuant to Section 66426 shall provide, to the extent feasible, for future passive or natural heating or cooling opportunities in the subdivision.

Examples of passive or natural heating opportunities in subdivision design, include design of lot size and configuration to permit orientation of a structure in an east-west alignment for southern exposure.

Examples of passive or natural cooling opportunities in subdivision design include design of lot size and configuration to permit orientation of a structure to take advantage of shade or prevailing breezes.

In providing for future passive or natural heating or cooling opportunities in the design of a subdivision, consideration shall be given to local climate, to contour, to configuration of the parcel to be divided, and to other design and improvement requirements, and such provision shall not result in reducing allowable densities or the percentage of a lot which may be occupied by a building or structure under applicable planning and zoning in force at the time the tentative map is filed.

The requirements of this section do not apply to condominium projects which consist of the subdivision of airspace in an existing building when no new structures are added.

For the purposes of this section, "feasible" means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social and technological factors.

(Added by Stats. 1978, Ch. 1154.)

 

66473.2. Telephone service

The legislative body of a city or county may, by ordinance, require the design of a subdivision for which a tentative map is required pursuant to Section 66426 to provide for the availability of individual household telephone service to each residential parcel in the subdivision.

(Added by Stats. 1980, Ch. 870.)

 

66473.3. Cable television systems

The legislative body of a city or county may, by ordinance, require the design of a subdivision for which a tentative map or parcel map is required pursuant to Section 66426 to provide one or more appropriate cable television systems an opportunity to construct, install, and maintain, on land identified on the map as dedicated or to be dedicated to public utility use, any equipment necessary to extend cable television services to each residential parcel in the subdivision.

"Appropriate cable television systems," as used in this section, means those franchised or licensed to serve the geographical area in which the subdivision is located.

This section shall not apply to the conversion of existing dwelling units to condominiums, community apartments, or stock cooperatives.

(Added by Stats. 1985, Ch. 917.)

 

66473.5. Findings: consistency with general and specific plans

No local agency shall approve a tentative map, or a parcel map for which a tentative map was not required, unless the legislative body finds that the proposed subdivision, together with the provisions for its design and improvement, is consistent with the general plan required by Article 5 (commencing with Section 65300) of Chapter 3 of Division 1, or any specific plan adopted pursuant to Article 8 (commencing with Section 65450) of Chapter 3 of Division 1.

A proposed subdivision shall be consistent with a general plan or a specific plan only if the local agency has officially adopted such a plan and the proposed subdivision or land use is compatible with the objectives, policies, general land uses, and programs specified in such a plan.

(Amended by Stats. 1983, Ch. 101.)

 

66473.6. Telephone or cable TV replacement, undergrounding, and relocation: cost reimbursement

Whenever a city or county imposes as a condition to its approval of a tentative map or a parcel map a requirement that necessitates replacing, undergrounding, or permanently or temporarily relocating existing facilities of a telephone corporation or cable television system, the developer or subdivider shall reimburse the telephone corporation or cable television system for all costs for the replacement, undergrounding, or relocation. All these costs shall be billed after they are incurred, and shall include a credit for any required advance payments and for the salvage value of any facilities replaced. In no event shall the telephone corporation or cable television system be reimbursed for costs incurred in excess of the cost to replace the facilities with substantially similar facilities.

(Added by Stats. 1985, Ch. 865.)

 

66474. Findings: grounds for denial

A legislative body of a city or county shall deny approval of a tentative map, or a parcel map for which a tentative map was not required, if it makes any of the following findings:

(a) That the proposed map is not consistent with applicable general and specific plans as specified in Section 65451.

(b) That the design or improvement of the proposed subdivision is not consistent with applicable general and specific plans.

(c) That the site is not physically suitable for the type of development.

(d) That the site is not physically suitable for the proposed density of development.

(e) That the design of the subdivision or the proposed improvements are likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat.

(f) That the design of the subdivision or type of improvements is likely to cause serious public health problems.

(g) That the design of the subdivision or the type of improvements will conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision. In this connection, the governing body may approve a map if it finds that alternate easements, for access or for use, will be provided, and that these will be substantially equivalent to ones previously acquired by the public. This subsection shall apply only to easements of record or to easements established by judgment of a court of competent jurisdiction and no authority is hereby granted to a legislative body to determine that the public at large has acquired easements for access through or use of property within the proposed subdivision.

(Amended by Stats. 1982, Ch. 518.)

 

66474.01. Tentative map approval with EIR and finding

Notwithstanding subdivision (e) of Section 66474, a local government may approve a tentative map, or a parcel map for which a tentative map was not required, if an environmental impact report was prepared with respect to the project and a finding was made pursuant to paragraph (3) of subdivision (a) of Section 21081 of the Public Resources Code that specific economic, social, or other considerations make infeasible the mitigation measures or project alternatives identified in the environmental impact report.

(Added by Stats. 1985, Ch. 738; Amended by Stats. 1994, Ch. 1294. Effective October 4, 1994.)

 

66474.1. Finding of substantial compliance prohibits denial

A legislative body shall not deny approval of a final or parcel map if it has previously approved a tentative map for the proposed subdivision and if it finds that the final or parcel map is in substantial compliance with the previously approved tentative map.

(Amended by Stats. 1982, Ch. 87. Effective March 1, 1982.)

 

66474.2. Tentative map approval

(a) Except as otherwise provided in subdivision (b) or (c), in determining whether to approve or disapprove an application for a tentative map, the local agency shall apply only those ordinances, policies, and standards in effect at the date the local agency has determined that the application is complete pursuant to Section 65943 of the Government Code.

(b) Subdivision (a) shall not apply to a local agency which, before it has determined an application for a tentative map to be complete pursuant to Section 65943, has done both of the following:

(1) Initiated proceedings by way of ordinance, resolution, or motion.

(2) Published notice in the manner prescribed in subdivision (a) of Section 65090 containing a description sufficient to notify the public of the nature of the proposed change in the applicable general or specific plans, or zoning or subdivision ordinances.

A local agency which has complied with this subdivision may apply any ordinances, policies, or standards enacted or instituted as a result of those proceedings which are in effect on the date the local agency approves or disapproves the tentative map.

(c) If the subdivision applicant requests changes in applicable ordinances, policies or standards in connection with the same development project, any ordinances, policies or standards adopted pursuant to the applicant’s request shall apply.

(Added by Stats. 1982, Ch. 1449. See note following 65961; Amended by Stats. 1988, Ch. 548; Amended by Stats. 1989, Ch. 847.)

 

66474.3. Effect of previous initiative measure

(a) If the legislative body of a city or county finds, based upon substantial evidence in the record, that any project for which a tentative map or a vesting tentative map has been approved will be affected by a previously enacted initiative measure to the extent that there is likely to be a default on land-secured bonds issued to finance infrastructure on the project, the legislative body shall allow that portion of the project served by that infrastructure to proceed in a manner consistent with approved tentative map or vesting tentative map.

(b) For purposes of this section, land-secured bond means any bond issued pursuant to the Improvement Act of 1911 (Division 7 (commencing with Section 5000) of the Streets and Highways Code), the Municipal Improvement Act of 1913 (Division 12 (commencing with Section 10000) of the Streets and Highways Code), the Improvement Bond Act of 1915 (Division 10 (commencing with Section 8500) of the Streets and Highways Code), or the Mello-Roos Community Facilities Act of 1982 (Chapter 2.5 (commencing with Section 53311) or Part 1 of Division 2 of Title 5, so long as the bond was issued and sold at least 90 days before the proposed initiative was adopted by either popular vote at an election or by ordinance adopted by the legislative body.

(c) Notwithstanding subdivision (a), the legislative body may condition or deny a permit, approval, extension, or entitlement if it determines any of the following:

(1) A failure to do so would place the residents of the subdivision or the immediate community, or both, in a condition dangerous to their health or safety, or both.

(2) The condition or denial is required, in order to comply with state or federal law.

(d) An approved or conditionally approved tentative or vesting tentative map shall be subject to the periods of time set forth in Section 66452.6.

(e) The rights conferred by this section shall expire if a final map is not approved prior to the expiration of the tentative map or of the vesting tentative map.

(f) An approved or conditionally approved tentative map or vesting tentative map shall not limit a legislative body from imposing reasonable conditions on subsequent required approvals or permits necessary for the development and authorized by the ordinances, policies, and standards described in Section 66474.2 or 66498.1.

(Added by Stats. 1988, Ch. 1561.)

 

66474.4. Land subject to Williamson Act contract

(a) The legislative body of a city or county shall deny approval of a tentative map, or a parcel map for which a tentative map was not required, if it finds that the land is subject to a contract entered into pursuant to the California Land Conservation Act of 1965 (Chapter 7 (commencing with Section 51200) of Division 1 of Title 5) and that either the resulting parcels following a subdivision of that land would be too small to sustain their agricultural use or the subdivision will result in residential development not incidental to the commercial agricultural use of the land. For purposes of this section, land shall be presumed to be in parcels too small to sustain their agricultural use if the land is (1) less than 10 acres in size in the case of prime agricultural land, or (2) less than 40 acres in size in the case of land which is not prime agricultural land. For purposes of this section, agricultural land shall be presumed to be in parcels large enough to sustain their agricultural use if the land is (1) at least 10 acres in size in the case of prime agricultural land, or (2) at least 40 acres in size in the case of land which is not prime agricultural land.

(b) A legislative body may approve a subdivision with parcels smaller than those specified in this section if the legislative body makes either of the following findings:

(1) The parcels can nevertheless sustain an agricultural use permitted under the contract, or are subject to a written agreement for joint management pursuant to Section 51230.1, provided that the parcels which are jointly managed total at least 10 acres in size in the case of prime agricultural land or 40 acres in size in the case of land which is not prime agricultural land.

(2) One of the parcels contains a residence and is subject to Section 428 of the Revenue and Taxation Code; the residence has existed on the property for at least five years; the landowner has owned the parcels for at least 10 years; and the remaining parcels shown on the map are at least 10 acres in size if the land is prime agricultural land, or at least 40 acres in size if the land is not prime agricultural land.

(c) No other homesite parcels as described in paragraph (2) of subdivision (b) may be created on any remaining parcels under contract for at least 10 years following the creation of a homesite parcel pursuant to this section.

(d) This section shall not apply to land which is subject to a contract when any of the following has occurred:

(1) A local agency formation commission has approved the annexation of the land to a city and the city will not succeed to the contract as provided in Sections 51243 and 51243.5.

(2) Written notice of nonrenewal of the contract has been served prior to March 7, 1985, as provided in Section 51245.

(3) Written notice of nonrenewal of the contract has been served on or after March 7, 1985, as provided in Section 51245, and, as a result of that notice, there are no more than three years remaining in the term of the contract.

(4) The board or council has granted tentative approval for cancellation of the contract as provided in Section 51282.

(e) This section shall not be construed as limiting the power of legislative bodies to establish minimum parcel sizes larger than those specified in subdivision (a).

(Added by Stats. 1984, Ch. 1111; Amended by Stats. 1985, Ch. 788; Amended by Stats. 1990, Ch. 841; Amended by Stats. 1999, Ch. 1018.)

 

66474.5. Approval of land projects

No local agency shall approve a final subdivision map for any land project, as defined in Section 11000.5 of the Business and Professions Code, unless:

(a) The local agency has adopted a specific plan covering the area proposed to be included within the land project.

(b) The local agency finds that the proposed land project, together with the provisions for its design and improvement, is consistent with the specific plan for the area.

This section shall apply to land projects for which tentative maps were approved on or after November 10, 1969.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66474.6. Impact on community sewer system/optional disapproval with findings

The governing body of any local agency shall determine whether the discharge of waste from the proposed subdivision into an existing community sewer system would result in violation of existing requirements prescribed by a California regional water quality control board pursuant to Division 7 (commencing with Section 13000) of the Water Code. In the event that the governing body finds that the proposed waste discharge would result in or add to violation of requirements of such board, it may disapprove the tentative map or maps of the subdivision.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66474.7. Delegation of duties

The responsibilities of the governing body under the provisions of Sections 66473.5, 66474, 66474.1 and 66474.6 may be assigned to an advisory agency or appeal board provided the governing body adopts an ordinance which allows any interested person to appeal any decision of the advisory agency or the appeal board relative to such matters to the governing body. Such appellant shall be entitled to the same notice and rights regarding testimony as are accorded a subdivider under Section 66452.5.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66474.8. Local grading and drainage standards

No ordinance, regulation, policy, or procedure which regulates or prescribes standards for grading or drainage, adopted by or applicable to a local agency pursuant to Section 17922 or 17958 of the Health and Safety Code, shall apply to the construction of design or improvement work, including the rough grading of lots within the subdivision, performed pursuant to, or in connection with an approved or conditionally approved tentative map, final map, or parcel map unless the local agency has no other applicable ordinance, regulation, policy, or procedure which regulates or prescribes standards for grading or drainage for subdivision design or improvement.

(Added by Stats. 1985, Ch. 1504.)

 

66474.9. Conditions requiring subdivider to indemnify the local agency

(a) Except as provided in a subdivision (b), a local agency may not require, as a condition for a tentative, parcel, or final map application or approval, that the subdivider or an agent of the subdivider, defend, indemnify, or hold harmless the local agency or its agents, officers, and employees from any claim, action, or proceeding against the local agency as a result of the action or inaction of the local agency, advisory agency, appeal board, or legislative body in reviewing, approving, or denying the map.

(b) (1) A local agency may require, as a condition for a tentative, parcel, or final map application or approval, that the subdivider defend, indemnify, and hold harmless the local agency or its agents, officers, and employees from any claim, action, or proceeding against the local agency or its agents, officers, or employees to attack, set aside, void, or annul, an approval of the local agency, advisory agency, appeal board, or legislative body concerning a subdivision, which action is brought within the time period provided for in Section 66499.37.

(2) Any condition imposed pursuant to this subdivision shall include the requirement that the local agency promptly notify the subdivider of any claim, action, or proceeding and that the local agency cooperate fully in the defense. If the local agency fails to promptly notify the subdivider of any claim, action, or proceeding, or if the local agency fails to cooperate fully in the defense, the subdivider shall not thereafter be responsible to defend, indemnify, or hold harmless the local agency.

(c) Nothing contained in this section prohibits the local agency from participating in the defense of any claim, action, or proceeding, if both of the following occur:

(1) The agency bears its own attorney’s fees and costs.

(2) The agency defends the action in good faith.

(d) The subdivider shall not be required to pay or perform any settlement unless the settlement is approved by the subdivider.

(Added by Stats. 1986, Ch. 789.)

 

66474.10. Review of conditions

If the legislative body or advisory agency determines that engineering or land surveying conditions are to be imposed on a tentative map or a parcel map for which a tentative map was not required, those conditions shall be reviewed by the city engineer, city surveyor, county engineer or county surveyor, as appropriate, to determine compliance with generally accepted engineering or surveying practices.

(Added by Stats. 1989, Ch. 847.)

 

 

Article 2. Advisory Agencies

 

66474.60. Procedures for cities over 2,800,000

(a) In cities having a population of more than 2,800,000, the design, improvement and survey data of subdivisions and the form and content of tentative and final maps thereof, and the procedure to be followed in securing official approval are governed by the provisions of this chapter and by the additional provisions of local ordinances dealing with subdivisions, the enactment of which is required by this chapter.

(b) Local ordinances may provide a proper and reasonable fee to be collected from the subdivider for the examination of tentative and final maps.

(Amended by Stats. 1982, Ch. 518.)

 

66474.61. Findings: grounds for map denial

In cities having a population of more than 2,800,000, the advisory agency, appeal board or legislative body shall deny approval of a tentative map, or a parcel map for which a tentative map was not required, if it makes any of the following findings:

(a) That the proposed map is not consistent with applicable general and specific plans as specified in Section 65451.

(b) That the design or improvement of the proposed subdivision is not consistent with applicable general and specific plans.

(c) That the site is not physically suitable for the type of development.

(d) That the site is not physically suitable for the proposed density of development.

(e) That the design of the subdivision or the proposed improvements are likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat.

(f) That the design of the subdivision or the type of improvements is likely to cause serious public health problems.

(g) That the design of the subdivision or the type of improvements will conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision. In this connection, the legislative body may approve a map if it finds that alternate easements, for access or for use, will be provided, and that these will be substantially equivalent to ones previously acquired by the public.

This subdivision shall apply only to easements of record or to easements established by judgment of a court of competent jurisdiction and no authority is hereby granted to a legislative body to determine that the public at large has acquired easements for access through or use of property within the proposed subdivision.

(Amended by Stats. 1982, Ch. 518.)

 

66474.62. Finding of substantial compliance

In cities having a population of more than 2,800,000, a legislative body shall not deny approval of a final subdivision map pursuant to subdivision (c) of Section 66474.60 or Section 66474.61 if it, the advisory agency or the appeal board has previously approved a tentative map for the proposed subdivision and if it finds that the final map is in substantial compliance with the previously approved tentative map and with the conditions to the approval thereof.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66474.63. Impact on community sewer system/optional disapproval with findings

In cities having a population of more than 2,800,000, the advisory agency, appeal board or legislative body shall determine whether the discharge of waste from the proposed subdivision into an existing community sewer system would result in violation of existing requirements prescribed by a California regional water quality control board pursuant to Division 7 (commencing with Section 13000) of the Water Code. In the event that the advisory agency, appeal board or legislative body finds that the proposed waste discharge would result in or add to violation of requirements of such board, the body making such finding may disapprove the tentative map or maps of the subdivision.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66474.64. Notice to subdivider

In cities having a population of more than 2,800,000, if the legislative body authorizes the advisory agency to report its action directly to the subdivider, the advisory agency shall, prior to making its report to the subdivider upon a subdivision as defined in this chapter, give notice of hearing in such manner as may be prescribed by local ordinance to the subdivider and to all property owners within 300 feet of the proposed subdivision and pursuant thereto shall conduct a public hearing at which time all persons interested in or affected by such proposed subdivision shall be heard.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

 

Article 3. Dedications

 

66475. Dedications for streets, access, drainage

There may be imposed by local ordinance a requirement of dedication or irrevocable offer of dedication of real property within the subdivision for streets, alleys, including access rights and abutter’s rights, drainage, public utility easements and other public easements. Such irrevocable offers may be terminated as provided in subdivisions (c) and (d) of Section 66477.2.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66475.1. Bicycle paths

Whenever a subdivider is required pursuant to Section 66475 to dedicate roadways to the public, he may also be required to dedicate such additional land as may be necessary and feasible to provide bicycle paths for the use and safety of the residents of the subdivision, if the subdivision, as shown on the final map thereof, contains 200 or more parcels.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66475.2. Local transit facilities

There may be imposed by local ordinance a requirement of dedication or irrevocable offer of dedication of land within the subdivision for local transit facilities such as bus turnouts, benches, shelters, landing pads and similar items which directly benefit the residents of a subdivision if (a) the subdivision as shown on the tentative map has the potential for 200 dwelling units or more if developed to the maximum density shown on the adopted general plan or contains 100 acres or more, and (b) the governing body finds that transit services are or will within a reasonable time period be made available to such subdivision. Such irrevocable offers may be terminated as provided in subdivision (c) and (d) of Section 66477.2.

The provisions of this section do not apply to condominium projects or stock cooperatives which consist of the subdivision of airspace in an existing apartment building which is more than five years old when no new dwelling units are added.

(Amended by Stats. 1979, Ch. 1192.)

 

66475.3. Sunlight easements

For divisions of land for which a tentative map is required pursuant to Section 66426, the legislative body of a city or county may by ordinance require, as a condition of the approval of a tentative map, the dedication of easements for the purpose of assuring that each parcel or unit in the subdivision for which approval is sought shall have the right to receive sunlight across adjacent parcels or units in the subdivision for which approval is sought for any solar energy system, provided that such ordinance contains all of the following:

(1) Specifies the standards for determining the exact dimensions and locations of such easements.

(2) Specifies any restrictions on vegetation, buildings and other objects which would obstruct the passage of sunlight through the easement.

(3) Specifies the terms or conditions, if any, under which an easement may be revised or terminated.

(4) Specifies that in establishing such easements consideration shall be given to feasibility, contour, configuration of the parcel to be divided, and cost, and that such easements shall not result in reducing allowable densities or the percentage of a lot which may be occupied by a building or a structure under applicable planning and zoning in force at the time such tentative map is filed.

(5) Specifies that the ordinance is not applicable to condominium projects which consist of the subdivision of airspace in an existing building where no new structures are added.

For the purposes of this section, "solar energy systems" shall be defined as set forth in Section 801.5 of the Civil Code.

For purposes of this section, "feasibility" shall have the same meaning as set forth in Section 66473.1 for the term "feasible".

(Added by Stats. 1978, Ch. 1154.)

 

66475.4. Definition: dedication

(a) As used in this section, "dedication" means a transfer by a subdivider to a city, county, or city and county of title to real property or any interest therein, or of an easement or right in real property, the transfer of facilities, or the installation of improvements as defined in Section 66419, or any combination thereof.

(b) A dedication requirement imposed as a condition of approval of a tentative map is invalid to the extent to which it is determined by a court to be excessive. A dedication requirement is excessive to the extent it is not reasonably necessary to meet public needs arising as a result of the subdivision. If, at the time of imposition of the dedication requirement, a city, county, or city and county provides a mechanism for determining the amount of compensation for that portion of the dedication requirement which is excessive, and the manner of payment thereof, this section shall not apply.

(c) A dedication requirement claimed to be excessive in whole or in part, which is imposed as a condition of approval of a tentative map, may be reviewed by a writ of administrative mandate pursuant to Section 1094.5 of the Code of Civil Procedure. In such a proceeding, the petitioner must have protested in the administrative record the imposition of the dedication, or portion of the dedication, claimed to be excessive. The petition for the writ shall be filed within the time prescribed by Section 66499.37.

(d) If the dedication requirement is determined to be excessive, in whole or in part, the court shall order the city, county, or city and county which imposed the requirement to elect, within 45 days of the date of its order, to take one of the following actions:

(1) To require amendment of the tentative subdivision map or redesign of the subdivision, taking into account the court’s decision and the requirements of Sections 66473.1, 66473.5, 66474, and 66474.6.

(2) To pay just compensation for that portion of the dedication determined to be excessive.

(3) To require amendment of the tentative subdivision map by deletion or modification of the dedication found to be excessive.

(e) If the city, county, or city and county elects to pay compensation, the amount of compensation shall be determined as provided by Chapters 8 (commencing with Section 1260.010) and 9 (commencing with Section 1263.010) of Title 7 of Part 3 of the Code of Civil Procedure.

(f) If the city, county, or city and county elects to require redesign of the map or to delete or modify the excessive dedication requirement, the court shall order the action to be taken within 120 days or such longer period of time as determined by the court upon application of either party. The court shall retain jurisdiction to ensure compliance with its order.

(g) If, within 45 days after the date of the court’s order, the city, county, or city and county does not elect to take one of the actions specified in paragraph (1) or (3) of subdivision (d), it shall be conclusively presumed to have elected to pay just compensation.

(h) The provisions of this section do not apply to any mitigation measures imposed by local agencies pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) to mitigate adverse environmental impacts identified in an environmental document prepared for the project under that act.

(i) This section shall remain in effect only until January 1, 1996, and as of that date is repealed, unless a later enacted statute, which is enacted before January 1, 1996, deletes or extends that date.

(Added by Stats. 1984, Ch. 1722; Amended by Stats. 1987, Ch. 803.)

 

66476. Waiver of access rights

There may be imposed by local ordinance a requirement that dedications or offers of dedication of streets include a waiver of direct access rights to any such street from any property shown on a final or parcel map as abutting thereon and if the dedication is accepted, any such waiver shall become effective in accordance with its provisions.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66477. Local requirements for park and recreation dedications (Quimby Act)

(a) The legislative body of a city or county may, by ordinance, require the dedication of land or impose a requirement of the payment of fees in lieu thereof, or a combination of both, for park or recreational purposes as a condition to the approval of a tentative map or parcel map, if all of the following requirements are met ***:

(1) The ordinance has been in effect for a period of 30 days prior to the filing of the tentative map of the subdivision or parcel map.

(2) The ordinance includes definite standards for determining the proportion of a subdivision to be dedicated and the amount of any fee to be paid in lieu thereof. The amount of land dedicated or fees paid shall be based upon the residential density, which shall be determined on the basis of the approved or conditionally approved tentative map or parcel map and the average number of persons per household. There shall be a rebuttable presumption that the average number of persons per household by units in a structure is the same as that disclosed by the most recent available federal census or a census taken pursuant to Chapter 17 (commencing with Section 40200) of Part 2 of Division 3 of Title 4. However, the dedication of land, or the payment of fees, or both, shall not exceed the proportionate amount necessary to provide three acres of park area per 1,000 persons residing within a subdivision subject to this section, unless the amount of existing neighborhood and community park area, as calculated pursuant to this subdivision, exceeds that limit, in which case the legislative body may adopt the calculated amount as a higher standard not to exceed five acres per 1,000 persons residing within a subdivision subject to this section.

(A) The park area per 1,000 members of the population of the city, county, or local public agency shall be derived from the ratio that the amount of neighborhood and community park acreage bears to the total population of the city, county, or local public agency as shown in the most recent available federal census. The amount of neighborhood and community park acreage shall be the actual acreage of existing neighborhood and community parks of the city, county, or local public agency as shown on its records, plans, recreational element, maps, or reports as of the date of the most recent available federal census.

(B) For cities incorporated after the date of the most recent available federal census, the park area per 1,000 members of the population of the city shall be derived from the ratio that the amount of neighborhood and community park acreage shown on the records, maps, or reports of the county in which the newly incorporated city is located bears to the total population of the new city as determined pursuant to Section 11005 of the Revenue and Taxation Code. In making any subsequent calculations pursuant to this section, the county in which the newly incorporated city is located shall not include the figures pertaining to the new city which were calculated pursuant to this paragraph. Fees shall be payable at the time of the recording of the final map or parcel map or at a later time as may be prescribed by local ordinance.

(3) The land, fees, or combination thereof are to be used only for the purpose of developing new or rehabilitating existing neighborhood or community park or recreational facilities to serve the subdivision.

(4) The legislative body has adopted a general plan or specific plan containing policies and standards for parks and recreation facilities, and the park and recreational facilities are in accordance with definite principles and standards.

(5) The amount and location of land to be dedicated or the fees to be paid shall bear a reasonable relationship to the use of the park and recreational facilities by the future inhabitants of the subdivision.

(6) The city, county, or other local public agency to which the land or fees are conveyed or paid shall develop a schedule specifying how, when, and where it will use the land or fees, or both, to develop park or recreational facilities to serve the residents of the subdivision. Any fees collected under the ordinance shall be committed within five years after the payment of such fees or the issuance of building permits on one-half of the lots created by the subdivision, whichever occurs later. If the fees are not committed, they, without any deductions, shall be distributed and paid to the then record owners of the subdivision in the same proportion that the size of their lot bears to the total area of all lots within the subdivision.

(7) Only the payment of fees may be required in subdivisions containing 50 parcels or less, except that when a condominium project, stock cooperative, or community apartment project, as those terms are defined in Section 1351 of the Civil Code, exceeds 50 dwelling units, dedication of land may be required notwithstanding that the number of parcels may be less than 50.

(8) Subdivisions containing less than five parcels and not used for residential purposes shall be exempted from the requirements of this section. However, in that event, a condition may be placed on the approval of such parcel map that if a building permit is requested for construction of a residential structure or structures on one or more of the parcels within four years, the fee may be required to be paid by the owner of each such parcel as a condition of *** the issuance of the *** permit.

(9) If the subdivider provides park and recreational improvements to the dedicated land, the value of the improvements together with any equipment located thereon shall be a credit against the payment of fees or dedication of land required by the ordinance.

(b) Land or fees required under this section shall be conveyed or paid directly to the local public agency which provides park and recreational services on a communitywide level and to the area within which the proposed development will be located, if that *** agency elects to accept the land or fee. The local agency accepting the *** land or funds shall develop the land or use the funds in the manner provided in this section.

(c) If park and recreational services and facilities are provided by a public agency other than a city or a county, the amount and location of land to be dedicated or fees to be paid shall, subject to paragraph (2) of subdivision (a), be jointly determined by the city or county having jurisdiction and that other *** public agency.

(d) This section does not apply to commercial or industrial subdivisions or to condominium projects or stock cooperatives that *** consist of the subdivision of airspace in an existing apartment building which is more than five years old when no new dwelling units are added.

(e) Common interest developments, as defined in Section 1351 of the Civil Code, *** shall be eligible to receive a credit, as determined by the legislative body, against the amount of land required to be dedicated, or the amount of the fee imposed, pursuant to this section, for the value of private open space within the development which is usable for active recreational uses.

(f) Park and recreation purposes shall include land and facilities for the activity of "recreational community gardening," which activity consists of the cultivation by persons other than, or in addition to, the owner of such land, of plant material not for sale.

(g) This section shall be known and may be cited as the Quimby Act.

(Amended by Stats. 1984, Ch. 1009; Amended by Stats. 1985, Ch. 286; Amended by Stats. 1986, Ch. 291; Amended by Stats. 1998, Ch. 689.)

 

66477.1. Acceptance/rejection of dedications

(a) At the time the legislative body or the official designated pursuant to Section 66458 approves a final map, the legislative body or the designated official *** shall also accept, accept subject to improvement, or reject any offer of dedication. The clerk of the legislative body shall certify or state on the map the action by the legislative body or designated official.

(b) The legislative body of a county, or a county officer designated by the legislative body, may accept into the county road system, pursuant to Section 941 of the Streets and Highways Code, any road for which an offer of dedication has been accepted or accepted subject to improvements.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975; Amended by Stats. 1985, Ch. 114. Effective June 28, 1985; Amended by Stats. 1987, Ch. 982; Amended by Stats. 1988, Ch. 132; Amended by Stats. 1998, Ch. 604)

 

66477.2. Rescission of rejection, termination and abandonment of dedication offer

(a) If at the time the final map is approved, any streets, paths, alleys, public utility easements, rights-of-way for local transit facilities such as bus turnouts, benches, shelters, landing pads, and similar items, which directly benefit the residents of a subdivision, or storm drainage easements are rejected, subject to Section 771.010 of the Code of Civil Procedure, the offer of dedication shall remain open and the legislative body may by resolution at any later date, and without further action by the subdivider, rescind its action and accept and open the streets, paths, alleys, rights-of-way for local transit facilities such as bus turnouts, benches, shelters, landing pads, and similar items, which directly benefit the residents of a subdivision, or storm drainage easements for public use, which acceptance shall be recorded in the office of the county recorder.

(b) In the case of any subdivision fronting upon the ocean coastline or bay shoreline, the offer of dedication of public access route or routes from public highways to land below the ordinary high watermark shall be accepted within three years after the approval of the final map; in the case of any subdivision fronting upon any public waterway, river, or stream, the offer of dedication of public access route or routes from public highways to the bank of the waterway, river, or stream and the public easement along a portion of the bank of the waterway, river, or stream shall be accepted within three years after the approval of the final map; in the case of any subdivision fronting upon any lake or reservoir which is owned in part or entirely by any public agency, including the state, the offer of dedication of public access route or routes from public highways to any water of such lake or reservoir shall be accepted within five years after the approval of the final map; all other offers of dedication may be accepted at any time.

(c) Offers of dedication which are covered by subdivision (a) may be terminated and abandoned in the same manner as prescribed for the summary vacation of streets by Part 3 (commencing with Section 8300) of Division 9 of the Streets and Highways Code.

(d) Offers of dedication which are not accepted within the time limits specified in subdivision (b) shall be deemed abandoned.

(e) Except as provided in Sections 66499.16, 66499.17, and 66499.18, if a resubdivision or reversion to acreage of the tract is subsequently filed for approval, any offer of dedication previously rejected shall be deemed to be terminated upon the approval of the map by the legislative body. The map shall contain a notation identifying the offer or offers of dedication deemed terminated by this subdivision.

(Amended by Stats. 1982, Ch. 87. Effective March 1, 1982; Amended by Stats. 1994, Ch. 458.)

 

66477.3. Dedication acceptance ineffective until map filed

Acceptance of offers of dedication on a final map shall not be effective until the final map is filed in the office of the county recorder or a resolution of acceptance by the legislative body is filed in such office.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66477.5. Reconveyance of dedications

(a) The local agency to which property is dedicated in fee for public purposes, or for making public improvements or constructing public facilities, other than for open space, parks, or schools, shall record a certificate with the county recorder in the county in which the property is located. The certificate shall be attached to the map and shall contain all of the following information:

(1) The name and address of the subdivider dedicating the property.

(2) A legal description of the real property dedicated.

(3) A statement that the local agency shall reconvey the property to the subdivider if the local agency makes a determination pursuant to this section that the same public purpose for which the property was dedicated does not exist, or the property or any portion thereof is not needed for public utilities, as specified in subdivision (c).

(b) The subdivider may request that the local agency make the determination that the same public purpose for which the dedication was required still exists, after payment of a fee which shall not exceed the amount reasonably required to make the determination. The determination may be made by reference to a capital improvement plan as specified in Section 65403 or 66002, an applicable general or specific plan requirement, the subdivision map, or other public documents that identify the need for the dedication.

(c) If a local agency has determined that the same public purpose for which the dedication was required does not exist, it shall reconvey the property to the subdivider or the successor in interest, as specified in subdivision (a), except for all or any portion of the property that is required for that same public purpose or for public utilities.

(d) If a local agency decided to vacate, lease, sell, or otherwise dispose of the dedicated property the local agency shall give at least 60 days notice to the subdivider whose name appears on the certificate before vacating, leasing, selling, or otherwise disposing of the dedicated property. This notice is not required if the dedicated property will be used for the same public purpose for which it was dedicated.

(e) This section shall only apply to property required to be dedicated on or after January 1, 1990.

(Repealed by Stats. 1984, Ch. 896, operative January 1, 1987; Amended by Stats. 1989, Ch. 822.)

 

66478. Reconveyance of dedications

Whether by request of a county board of education or otherwise, a city or county may adopt an ordinance requiring any subdivider who develops or completes the development of one or more subdivisions in one or more school districts maintaining an elementary school to dedicate to the school district, or districts, within which such subdivisions are to be located, such land as the local legislative body shall deem to be necessary for the purpose of constructing thereon such elementary schools as are necessary to assure the residents of the subdivision adequate public school service. In no case shall the local legislative body require the dedication of an amount of land which would make development of the remaining land held by the subdivider economically unfeasible or which would exceed the amount of land ordinarily allowed under the procedures of the State Allocation Board.

An ordinance adopted pursuant to this section shall not be applicable to a subdivider who has owned the land being subdivided for more than 10 years prior to the filing of the tentative maps in accordance with Article 2 (commencing with Section 66452) of Chapter 3 of this division. The requirement of dedication shall be imposed at the time of approval of the tentative map. If, within 30 days after the requirement of dedication is imposed by the city or county, the school district does not offer to enter into a binding commitment with the subdivider to accept the dedication, the requirement shall be automatically terminated. The required dedication may be made any time before, concurrently with, or up to 60 days after, the filing of the final map on any portion of the subdivision. The school district shall, in the event that it accepts the dedication, repay to the subdivider or his successors the original cost to the subdivider of the dedicated land, plus a sum equal to the total of the following amounts:

(a) The cost of any improvements to the dedicated land since acquisition by the subdivider.

(b) The taxes assessed against the dedicated land from the date of the school district’s offer to enter into the binding commitment to accept the dedication.

(c) Any other costs incurred by the subdivider in maintenance of such dedicated land, including interest costs incurred on any loan covering such land.

If the land is not used by the school district, as a school site, within 10 years after dedication, the subdivider shall have the option to repurchase the property from the district for the amount paid therefor.

The school district to which the property is dedicated shall record a certificate with the county recorder in the county in which the property is located. The certificate shall contain the following information:

(1) The name and address of the subdivider dedicating the property.

(2) A legal description of the real property dedicated.

(3) A statement that the subdivider dedicating the property has an option to repurchase the property if it is not used by the school district as a school site within 10 years after dedication.

(4) Proof of the acceptance of the dedication by the school district and the date of the acceptance. The certificate shall be recorded not more than 10 days after the date of acceptance of the dedication. The subdivider shall have the right to compel the school district to record such certificate, but until such certificate is recorded, any rights acquired by any third party dealing in good faith with the school district shall not be impaired or otherwise affected by the option right of the subdivider.

If any subdivider is aggrieved by, or fails to agree to the reasonableness of any requirement imposed pursuant to this section, he may bring a special proceeding in the superior court pursuant to Section 66499.37.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

 

Article 3.5. Public Access to Public Resources

 

66478.1. Intent

It is the intent of the Legislature, by the provisions of Sections 66478.1 through 66478.10 of this article to implement Section 4 of Article X of the California Constitution insofar as Sections 66478.1 through 66478.10 are applicable to navigable waters.

(Amended by Stats. 1975, Ch. 24. Effective April 4, 1975; Amended by Stats. 1986, Ch. 1019.

 

66478.2. State policy: growth and natural resources

The Legislature finds and declares that the public natural resources of this state are limited in quantity and that the population of this state has grown at a rapid rate and will continue to do so, thus increasing the need for utilization of public natural resources. The increase in population has also increased demand for private property adjacent to public natural resources through real estate subdivision developments which resulted in diminishing public access to public natural resources.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66478.3. State policy: increased public access

The Legislature further finds and declares that it is essential to the health and well-being of all citizens of this state that public access to public natural resources be increased. It is the intent of the Legislature to increase public access to public natural resources.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66478.4. Access to navigable waters

(a) No local agency shall approve either a tentative or a final map of any proposed subdivision to be fronted upon a public waterway river or stream which does not provide, or have available, reasonable public access by fee or easement from a public highway to that portion of the bank of the river or stream bordering or lying within the proposed subdivision.

(b) Reasonable public access shall be determined by the local agency in which the proposed subdivision is to be located. In making the determination of what shall be reasonable access, the local agency shall consider all of the following:

(1) That access may be by highway, foot trail, bike trail, horse trail, or any other means of travel.

(2) The size of the subdivision.

(3) The type of riverbank and the various appropriate recreational, educational, and scientific uses, including, but not limited to, swimming, diving, boating, fishing, water skiing, scientific collection, and teaching.

(4) The likelihood of trespass on private property and reasonable means of avoiding such trespasses.

(c) A public waterway river or stream for the purposes of Sections 66477.2, 66478.4, 66478.5 and 66478.6 means those waterways, rivers and streams defined in Sections 100 through 106 of the Harbors and Navigation Code, any stream declared to be a public highway for fishing pursuant to Sections 25660 through 25662 of the Government Code, the rivers listed in Section 1505 of the Fish and Game Code as spawning areas, all waterways, rivers and streams downstream from any state or federal salmon or steelhead fish hatcheries.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66478.5. Easement along waterways

(a) No local agency shall approve either a tentative or a final map of any proposed subdivision to be fronted upon a public waterway river or stream which does not provide for a dedication of a public easement along a portion of the bank of the river or stream bordering or lying within the proposed subdivision.

(b) The extent, width and character of the public easement shall be reasonably defined to achieve reasonable public use of the public waterway river or stream consistent with public safety. The reasonableness and extent of the easement shall be determined by the local agency in which the proposed subdivision is to be located. In making the determination for reasonably defining the extent, width, and character of the public easement, the local agency shall consider all of the following:

(1) That the easement may be for a foot trail, bicycle trail, or horse trail.

(2) The size of the subdivision.

(3) The type of riverbank and the various appropriate recreational, educational and scientific uses including, but not limited to, swimming, diving, boating, fishing, water skiing, scientific collection and teaching.

(4) The likelihood of trespass on private property and reasonable means of avoiding such trespasses.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66478.6. Designation on map

Any public access route or routes and any easement along the bank of a public waterway river or stream provided by the subdivider shall be expressly designated on the tentative or final map, and such map shall expressly designate the governmental entity to which such route or routes are dedicated and its acceptance of such dedication.

(Amended by Stats. 1975, Ch. 24. Effective April 4, 1975.)

 

66478.7. No limitation on parks

Nothing in this article shall be construed to limit any powers or duties in connection with or affect the operation of beaches or parks in this state or to limit or decrease the authority, powers, or duties of any public agency or entity.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66478.8. Alternative access/availability finding

Nothing in Sections 66478.1 through 66478.10 of this article shall require a local agency to disapprove either a tentative or final map solely on the basis that the reasonable public access otherwise required by this article is not provided through or across the subdivision itself, if the local agency makes a finding that such reasonable public access is otherwise available within a reasonable distance from the subdivision.

Any such finding shall be set forth on the face of the tentative or final map.

(Amended by Stats. 1975, Ch. 24. Effective April 4, 1975.)

 

66478.9. Inapplicability: power facilities

Nothing in Section 66478.5 shall apply to the site of electric power generating facilities.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66478.10. Inapplicability: industrial subdivisions

Nothing in Sections 66478.1 through 66478.10 of this article shall apply to industrial subdivisions.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66478.11. Access to coastline

(a) No local agency shall approve either the tentative or the final map of any subdivision fronting upon the coastline or shoreline which subdivision does not provide or have available reasonable public access by fee or easement from public highways to land below the ordinary high water mark on any ocean coastline or bay shoreline within or at a reasonable distance from the subdivision.

Any public access route or routes provided by the subdivider shall be expressly designated on the tentative or final map, and such map shall expressly designate the governmental entity to which such route or routes are dedicated.

(b) Reasonable public access, as used in subdivision (a), shall be determined by the local agency in which the subdivision lies.

(c) In making the determination of what shall be reasonable public access, the local agency shall consider:

(1) That access may be by highway, foot trail, bike trail, horse trail, or any other means of travel.

(2) The size of the subdivision.

(3) The type of coastline or shoreline and the various appropriate recreational, educational, and scientific uses, including, but not limited to, diving, sunbathing, surfing, walking, swimming, fishing, beachcombing, taking of shellfish and scientific exploration.

(4) The likelihood of trespass on private property and reasonable means of avoiding such trespasses.

(d) Nothing in this section shall require a local agency to disapprove either a tentative or final map solely on the basis that the reasonable public access otherwise required by this section is not provided through or across the subdivision itself, if the local agency makes a finding that such reasonable public access is otherwise available within a reasonable distance from the subdivision.

Any such finding shall be set forth on the face of the tentative or final map.

(e) The provisions of this section shall not apply to the final map of any subdivision the tentative map of which has been approved by a local agency prior to the effective date of this section.

(f) The provisions of this section shall not apply to the final or tentative map of any subdivision which is in compliance with the plan of any planned development or any planned community which has been approved by a local agency prior to December 31, 1968. The exclusion provided by this subdivision shall be in addition to the exclusion provided by subdivision (e).

(g) Nothing in this section shall be construed as requiring the subdivider to improve any access route or routes which are primarily for the benefit of nonresidents of the subdivision area.

(h) Any access route or routes provided by the subdivider pursuant to this section may be conveyed or transferred to any state or local agency by the governmental entity to which such route or routes have been dedicated, at any future time, by mutual consent of such governmental entity and the particular state or local agency. Such conveyance or transfer shall be recorded by the recipient state or local agency in the office of the county recorder of the county in which such route or routes are located.

(Amended by Stats. 1975, Ch. 24. Effective April 4, 1975.)

 

66478.12. Access to reservoir or lake

(a) No local agency shall approve either the tentative or the final map of any subdivision fronting upon any lake or reservoir which is owned in part or entirely by any public agency including the state, which subdivision does not provide or have available reasonable access by fee or easement from public highways to any water of the lake or reservoir upon which the subdivision borders either within the subdivision or a reasonable distance from the subdivision.

Any public access route or routes provided by the subdivider shall be expressly designated on the tentative or final map, and such map shall expressly designate the governmental entity to which such route or routes are dedicated and its acceptance of such dedication.

(b) Reasonable access, as used in subdivision (a), shall be determined by the local agency in which the subdivision lies.

(c) In making the determination of what shall be reasonable access, the local agency shall consider:

(1) That access may be by highway, foot trail, bike trail, horse trail, or any other means of travel.

(2) The size of the subdivision.

(3) The type of shoreline and the various appropriate recreational, educational, and scientific uses, including, but not limited to, swimming, diving, boating, fishing, water skiing, scientific exploration, and teaching.

(4) The likelihood of trespass on private property and reasonable means of avoiding such trespasses.

(d) Nothing in this section shall require a local agency to disapprove either a tentative or final map solely on the basis that the reasonable access otherwise required by this section is not provided through or across the subdivision itself, if the local agency makes a finding that such reasonable access is otherwise available within a reasonable distance from the subdivision.

Any such finding shall be set forth on the face of the tentative or final map.

(e) The provisions of this section shall not apply to the final map of any subdivision the tentative map of which has been approved by a local agency prior to the effective date of this section.

(f) Any access route or routes provided by the subdivider pursuant to this section may be conveyed or transferred to any state or local agency by the governmental entity to which such route or routes have been dedicated, at any future time, by mutual consent of such governmental entity and the particular state or local agency. Such conveyance or transfer shall be recorded by the recipient state or local agency in the office of the county recorder of the county in which such route or routes are located.

(Amended by Stats. 1975, Ch. 24. Effective April 4, 1975.)

 

66478.13. Application to certain land diversions/finding

No local agency shall issue any permit or grant any approval necessary to develop any real property which is excluded from regulation under this division as a subdivision pursuant to subdivision (d) of Section 66426 because such property is in excess of 40 acres and was created as such a parcel after December 31, 1969, when such property fronts on the coastline or a shoreline, unless it finds that reasonable public access has been provided from public highways to land below the ordinary high-water mark or any ocean coastline or bay shoreline or any water of a lake or reservoir upon which the real property fronts.

"Reasonable public access" as used in this section shall be determined by the local agency in which the real property lies. In making such determination the local agency shall use the same criteria as those set forth in subdivisions (c) and (d) of Section 66478.11 and subdivisions (c) and (d) of Section 66478.12.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66478.14. Subdivision to benefit

Nothing in this article shall be construed as requiring the subdivider to improve any route or routes which are primarily for the benefit of nonresidents of the subdivision area or nonowners of the real property in question.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

 

Article 4. Reservations

 

66479. Authority to impose reservation of lands for public use

There may be imposed by local ordinance a requirement that areas of real property within the subdivision be reserved for parks, recreational facilities, fire stations, libraries, or other public uses, subject to the following conditions:

(a) The requirement is based upon an adopted specific plan or an adopted general plan containing policies and standards for those uses, and the required reservations are in accordance with those policies and standards.

(b) The ordinance has been in effect for a period of at least 30 days prior to the filing of the tentative map.

(c) The reserved area is of such size and shape as to permit the balance of the property within which the reservation is located to develop in an orderly and efficient manner.

(d) The amount of land reserved will not make development of the remaining land held by the subdivider economically unfeasible.

The reserved area shall conform to the adopted specific or general plan and shall be in such multiples of streets and parcels as to permit an efficient division of the reserved area in the event that it is not acquired within the prescribed period; in such event, the subdivider shall make those changes as are necessary to permit the reserved area to be developed for the intended purpose consistent with good subdividing practices.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975; Amended by Stats. 1984, Ch. 1009.)

 

66480. Binding agreement to acquire reservation

The public agency for whose benefit an area has been reserved shall at the time of approval of the final map or parcel map enter into a binding agreement to acquire such reserved area within two years after the completion and acceptance of all improvements, unless such period of time is extended by mutual agreement. The purchase price shall be the market value thereof at the time of the filing of the tentative map plus the taxes against such reserved area from the date of the reservation and any other costs incurred by the subdivider in the maintenance of such reserved area, including interest costs incurred on any loan covering such reserved area.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66481. Binding agreement to acquire reservation

If the public agency for whose benefit an area has been reserved does not enter into such a binding agreement, the reservation of such area shall automatically terminate.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66482. Additional authority

The authority granted by this article is additional to all other authority granted by law to local agencies relating to subdivisions and shall in no way be construed as a limitation on or diminution of any such authority.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

 

Article 5. Fees

 

66483. Calculation of costs/findings

There may be imposed by local ordinance a requirement for the payment of fees for purposes of defraying the actual or estimated costs of constructing planned drainage facilities for the removal of surface and storm waters from local or neighborhood drainage areas and of constructing planned sanitary sewer facilities for local sanitary sewer areas, subject to the following conditions:

(a) The ordinance has been in effect for a period of at least 30 days prior to the filing of the tentative map or parcel map if no tentative map is required.

(b) The ordinance refers to a drainage or sanitary sewer plan adopted for a particular drainage or sanitary sewer area which contains an estimate of the total costs of constructing the local drainage or sanitary sewer facilities required by the plan, and a map of such area showing its boundaries and the location of such facilities.

(c) The drainage or sanitary sewer plan, in the case of a city situated in a county having a countywide general drainage or sanitary sewer plan, has been determined by resolution of the legislative body of the county to be in conformity with such a county plan; or in the case of a city situated in a county not having such a plan but in a district having such a plan, has been determined by resolution of the legislative body of the district to be in conformity with the district general plan; or in the case of a city situated in a county having such a plan and in a district having such a plan, has been determined by resolution of the legislative body of the county to be in conformity with such a plan and by resolution of the legislative body of the district to be in conformity with the district general plan.

(d) The costs, whether actual or estimated, are based upon findings by the legislative body which has adopted the local plan, that subdivision and development of property within the planned local drainage area or local sanitary sewer area will require construction of the facilities described in the drainage or sewer plan, and that the fees are fairly apportioned within such areas either on the basis of benefits conferred on property proposed for subdivision or on the need for such facilities created by the proposed subdivision and development of other property within such areas.

(e) The fee as to any property proposed for subdivision within such a local area does not exceed the pro rata share of the amount of the total actual or estimated costs of all facilities within such area which would be assessable on such property if such costs were apportioned uniformly on a per-acre basis.

(f) The drainage or sanitary sewer facilities planned are in addition to existing facilities serving the area at the time of the adoption of such a plan for the area.

Such fees shall be paid to the local public agencies which provide drainage or sanitary sewer facilities, and shall be deposited by such agencies into a "planned local drainage facilities fund" and a "planned local sanitary sewer fund," respectively. Separate funds shall be established for each local drainage and sanitary sewer area. Moneys in such funds shall be expended solely for the construction or reimbursement for construction of local drainage or sanitary sewer facilities within the area from which the fees comprising the fund were collected, or to reimburse the local agency for the cost of engineering and administrative services to form the district and design and construct the facilities. The local ordinance may provide for the acceptance of considerations in lieu of the payment of fees.

A local agency imposing or requesting the imposition of, fees pursuant to this section, including the agencies providing the facilities, may advance money from its general fund to pay the costs of constructing such facilities within a local drainage or sanitary sewer area and reimburse the general fund for such advances from the planned local drainage or sanitary sewer facilities fund for the local drainage or sanitary sewer area in which the drainage or sanitary sewer facilities were constructed.

A local agency receiving fees pursuant to this section may incur an indebtedness for the construction of drainage or sanitary sewer facilities within a local drainage or sanitary sewer area; provided that the sole security for repayment of such indebtedness shall be moneys in the planned local drainage or sanitary sewer facilities fund.

(Amended by Stats. 1975, Ch. 365.)

 

66483.1. Surplus funds

After completion of the facilities and the payment of all claims from any "planned local drainage facilities fund" or any "planned local sanitary sewer fund," the legislative body of a county or city shall determine by resolution the amount of the surplus, if any, remaining in any of those funds. Any surplus shall be used, in those amounts as the legislative body may determine, for one or more of the following purposes:

(a) For transfer to the general fund of the county or city, provided that the amount of the transfer shall not exceed 5 percent of the total amount expended from the particular fund, and provided that the funds transferred are used to support the operation and maintenance of those facilities for which the fees were collected;

(b) For the construction of additional or modified facilities within the particular drainage or sanitary sewer area; or

(c) As a refund in the manner provided in Section 66483.2.

(Amended by Stats. 1981, Ch. 914.)

 

66483.2. Refund of surplus

Any surplus remaining shall be refunded as follows:

(a) There shall be refunded to the current owners of property for which a fee was previously collected, the balance of such moneys in the same proportion which each individual fee collected bears to the total of all individual fees collected from the particular drainage or sewer area;

(b) Where property for which a fee was previously collected has subsequently been subdivided into more than one lot, each current owner of a lot shall share in the refund payable to the owners of the property for which a fee was previously collected in the same proportion which the area of each individual lot bears to the total area of the property for which a fee was previously collected; and

(c) There shall be transferred to the general fund of the county or city any remaining portion of the surplus which has not been paid to or claimed by the persons entitled thereto within two years from the date either of the completion of the improvements, or the adoption by the legislative body of a resolution declaring a surplus, whichever is later to occur.

(Added by Stats. 1975, Ch. 365.)

 

66484. Fees for bridges or major thoroughfares

(a) A local ordinance may require the payment of a fee as a condition of approval of a final map or as a condition of issuing a building permit for purposes of defraying the actual or estimated cost of constructing bridges over waterways, railways, freeways, and canyons, or constructing major thoroughfares. The ordinance may require payment of fees pursuant to this section if all of the following requirements are satisfied:

(1) The ordinance refers to the circulation element of the general plan and, in the case of bridges, to the transportation or flood control provisions thereof which identify railways, freeways, streams, or canyons for which bridge crossings are required on the general plan or local roads and in the case of major thoroughfares, to the provisions of the circulation element which identify those major thoroughfares whose primary purpose is to carry through traffic and provide a network connecting to the state highway system, if the circulation element, transportation or flood control provisions have been adopted by the local agency 30 days prior to the filing of a map or application for a building permit.

(2) The ordinance provides that there will be a public hearing held by the governing body for each area benefited. Notice shall be given pursuant to Section 65091 and shall include preliminary information related to the boundaries of the area of benefit, estimated cost, and the method of fee apportionment. The area of benefit may include land or improvements in addition to the land or improvements which are the subject of any map or building permit application considered at the proceedings.

(3) The ordinance provides that at the public hearing, the boundaries of the area of benefit, the costs, whether actual or estimated, and a fair method of allocation of costs to the area of benefit and fee apportionment are established. The method of fee apportionment, in the case of major thoroughfares, shall not provide for higher fees on land which abuts the proposed improvement except where the abutting property is provided direct usable access to the major thoroughfare. A description of the boundaries of the area of benefit, the costs, whether actual or estimated, and the method of fee apportionment established at the hearing shall be incorporated in a resolution of the governing body, a certified copy of which shall be recorded by the governing body conducting the hearing with the recorder of the county in which the area of benefit is located. The apportioned fees shall be applicable to all property within the area of benefit and shall be payable as a condition of approval of a final map or as a condition of issuing a building permit for the property or portions of the property. Where the area of benefit includes lands not subject to the payment of fees pursuant to this section, the governing agency shall make provision for payment of the share of improvement costs apportioned to those lands from other sources.

(4) The ordinance provides that payment of fees shall not be required unless the major thoroughfares are in addition to, or a reconstruction of, any existing major thoroughfares serving the area at the time of the adoption of the boundaries of the area of benefit.

(5) The ordinance provides that payment of fees shall not be required unless the planned bridge facility is an original bridge serving the area or an addition to any existing bridge facility serving the area at the time of the adoption of the boundaries of the area of benefit. The fees shall not be expended to reimburse the cost of existing bridge facility construction.

(6) The ordinance provides that if, within the time when protests may be filed under the provisions of the ordinance, there is a written protest, filed with the clerk of the legislative body, by the owners of more than one-half of the area of the property to be benefited by the improvement, and sufficient protests are not withdrawn so as to reduce the area represented to less than one-half of that to be benefited, then the proposed proceedings shall be abandoned, and the legislative body shall not, for one year from the filing of that written protest, commence or carry on any proceedings for the same improvement or acquisition under the provisions of this section.

(b) Any protest may be withdrawn by the owner protesting, in writing, at any time prior to the conclusion of a public hearing held pursuant to the ordinance.

(c) If any majority protest is directed against only a portion of the improvement then all further proceedings under the provisions of this section to construct that portion of the improvement so protested against shall be barred for a period of one year, but the legislative body may commence new proceedings not including any part of the improvement or acquisition so protested against. Nothing in this section prohibits a legislative body, within that one-year period, from commencing and carrying on new proceedings for the construction of a portion of the improvement so protested against if it finds, by the affirmative vote of four-fifths of its members, that the owners of more than one-half of the area of the property to be benefited are in favor of going forward with that portion of the improvement or acquisition.

(d) Nothing in this section precludes the processing and recordation of maps in accordance with other provisions of this division if the proceedings are abandoned.

(e) Fees paid pursuant to an ordinance adopted pursuant to this section shall be deposited in a planned bridge facility or major thoroughfare fund. A fund shall be established for each planned bridge facility project or each planned major thoroughfare project. If the benefit area is one in which more than one bridge is required to be constructed, a fund may be so established covering all of the bridge projects in the benefit area. Money in the fund shall be expended solely for the construction or reimbursement for construction of the improvement serving the area to be benefited and from which the fees comprising the fund were collected, or to reimburse the local agency for the cost of constructing the improvement.

(f) An ordinance adopted pursuant to this section may provide for the acceptance of considerations in lieu of the payment of fees.

(g) A local agency imposing fees pursuant to this section may advance money from its general fund or road fund to pay the cost of constructing the improvements and may reimburse the general fund or road fund for any advances from planned bridge facility or major thoroughfares funds established to finance the construction of those improvements.

(h) A local agency imposing fees pursuant to this section may incur an interest-bearing indebtedness for the construction of bridge facilities or major thoroughfares. However, the sole security for repayment of that indebtedness shall be moneys in planned bridge facility or major thoroughfares funds.

(i) The term "construction" as used in this section includes design, acquisition of right-of-way, administration of construction contracts, and actual construction.

(j) The term "construction," as used in this section, with respect to the unincorporated area of San Diego County only, includes design, acquisition of rights-of-way, and actual construction, including, but not limited to, all direct and indirect environmental, engineering, accounting, legal, administration of construction contracts, and other services necessary therefor. The term "construction," with respect to the unincorporated area of San Diego County only, also includes reasonable administrative expenses, not exceeding three hundred thousand dollars ($300,000) in any calendar year after January 1, 1986, as adjusted annually for any increase or decrease in the Consumer Price Index of the Bureau of Labor Statistics of the United States Department of Labor for all Urban Consumers, San Diego, California (1967 = 100), as published by the United States Department of Commerce for the purpose of constructing bridges and major thoroughfares. "Administrative expenses" means those office, personnel, and other customary and normal expenses associated with the direct management and administration of the agency, but not including costs of construction.

(k) Nothing in this section precludes a county or city from providing funds for the construction of bridge facilities or major thoroughfares to defray costs not allocated to the area of benefit.

(Amended by Stats. 1975, Ch. 24. Effective April 4, 1975; Amended by Stats. 1984, Ch. 1009; Amended by Stats. 1988, Ch. 1408.)

 

66484.3. County of Orange: fees for bridges and thoroughfares

(a) Notwithstanding Section 53077.5, the Board of Supervisors of the County of Orange and the city council or councils of any city or cities in that county may, by ordinance, require the payment of a fee as a condition of approval of a final map or as a condition of issuing a building permit for purposes of defraying the actual or estimated cost of constructing bridges over waterways, railways, freeways, and canyons, or constructing major thoroughfares.

(b) The local ordinance may require payment of fees pursuant to this section if:

(1) The ordinance refers to the circulation element of the general plan and, in the case of bridges, to the transportation provisions or flood control provisions of the general plan which identify railways, freeways, streams, or canyons for which bridge crossings are required on the general plan or local roads, and in the case of major thoroughfares, to the provisions of the circulation element which identify those major thoroughfares whose primary purpose is to carry through traffic and provide a network connecting to or which is part of the state highway system, and the circulation element, transportation provisions, or flood control provisions have been adopted by the local agency 30 days prior to the filing of a map or application for a building permit. Bridges which are part of a major thoroughfare need not be separately identified in the transportation or flood control provisions of the general plan.

(2) The ordinance provides that there will be a public hearing held by the governing body for each area benefited. Notice shall be given pursuant to Section 65905. In addition to the requirements of Section 65905, the notice shall contain preliminary information related to the boundaries of the area of benefit, estimated cost, and the method of fee apportionment. The area of benefit may include land or improvements in addition to the land or improvements which are the subject of any map or building permit application considered at the proceedings.

(3) The ordinance provides that at the public hearing, the boundaries of the area of benefit, the costs, whether actual or estimated, and a fair method of allocation of costs to the area of benefit and fee apportionment are established. The method of fee apportionment, in the case of major thoroughfares, shall not provide for higher fees on land which abuts the proposed improvement except where the abutting property is provided direct usable access to the major thoroughfare. A description of the boundaries of the area of benefit, the costs, whether actual or estimated, and the method of fee apportionment established at the hearing shall be incorporated in a resolution of the governing body, a certified copy of which shall be recorded by the governing body conducting the hearing with the recorder of the County of Orange. The resolution may subsequently be modified in any respect by the governing body. Modifications shall be adopted in the same manner as the original resolution, except that the resolution of a city or county which has entered into a joint exercise of powers agreement pursuant to subdivision (f), relating to constructing bridges over waterways, railways, freeways, and canyons or constructing major thoroughfares by the joint powers agency, may be modified by the joint powers agency following public notice and a public hearing, if the joint powers agency has complied with all applicable laws, including Chapter 5 (commencing with Section 66000) of Division 1. Any modification shall be subject to the protest procedures prescribed by paragraph (6). The resolution may provide for automatic periodic adjustment of fees based upon the California Construction Cost Index prepared and published by the Department of Transportation, without further action of the governing body, including, but not limited to, public notice or hearing. The apportioned fees shall be applicable to all property within the area of benefit and shall be payable as a condition of approval of a final map or as a condition of issuing a building permit for any of the property or portions of the property. Where the area of benefit includes lands not subject to the payment of fees pursuant to this section, the governing body shall make provision for payment of the share of improvement costs apportioned to those lands from other sources, but those sources need not be identified at the time of the adoption of the resolution.

(4) The ordinance provides that payment of fees shall not be required unless the major thoroughfares are in addition to, or a reconstruction or widening of, any existing major thoroughfares serving the area at the time of the adoption of the boundaries of the area of benefit.

(5) The ordinance provides that payment of fees shall not be required unless the planned bridge facility is an original bridge serving the area or an addition to any existing bridge facility serving the area at the time of the adoption of the boundaries of the area of benefit. Fees imposed pursuant to this section shall not be expended to reimburse the cost of existing bridge facility construction, unless these costs are incurred in connection with the construction of an addition to an existing bridge for which fees may be required.

(6) The ordinance provides that if, within the time when protests may be filed under its provisions, there is a written protest, filed with the clerk of the legislative body, by the owners of more than one-half of the area of the property to be benefited by the improvement, and sufficient protests are not withdrawn so as to reduce the area represented to less than one-half of that to be benefited, then the proposed proceedings shall be abandoned, and the legislative body shall not, for one year from the filing of that written protest, commence or carry on any proceedings for the same improvement or acquisition under this section, unless the protests are overruled by an affirmative vote of four-fifths of the legislative body.

Nothing in this section shall preclude the processing and recordation of maps in accordance with other provisions of this division if proceedings are abandoned.

Any protests may be withdrawn in writing by the owner who filed the protest, at any time prior to the conclusion of a public hearing held pursuant to the ordinance.

If any majority protest is directed against only a portion of the improvement then all further proceedings under the provisions of this section to construct that portion of the improvement so protested against shall be barred for a period of one year, but the legislative body shall not be barred from commencing new proceedings not including any part of the improvement or acquisition so protested against. Nothing in this section shall prohibit the legislative body, within the one-year period, from commencing and carrying on new proceedings for the construction of a portion of the improvement so protested against if it finds, by the affirmative vote of four-fifths of its members, that the owners of more than one-half of the area of the property to be benefited are in favor of going forward with that portion of the improvement or acquisition.

If the provisions of this paragraph (6), or provisions implementing this paragraph contained in any ordinance adopted pursuant to this section, are held invalid, that invalidity shall not affect other provisions of this section or of the ordinance adopted pursuant thereto, which can be given effect without the invalid provision, and to this end the provisions of this section and of an ordinance adopted pursuant thereto are severable.

(c) Fees paid pursuant to an ordinance adopted pursuant to this section shall be deposited in a planned bridge facility or major thoroughfare fund. A fund shall be established for each planned bridge facility project or each planned major thoroughfare project. If the benefit area is one in which more than one bridge or major thoroughfare is required to be constructed, a fund may be so established covering all of the bridge or major thoroughfare projects in the benefit area. Except as otherwise provided in subdivision (g), moneys in the fund shall be expended solely for the construction or reimbursement for construction of the improvement serving the area to be benefited and from which the fees comprising the fund were collected, or to reimburse the county or a city for the cost of constructing the improvement.

(d) An ordinance adopted pursuant to this section may provide for the acceptance of considerations in lieu of the payment of fees.

(e) The county or a city imposing fees pursuant to this section may advance money from its general fund or road fund to pay the cost of constructing the improvements and may reimburse the general fund or road fund from planned bridge facilities or major thoroughfares funds established to finance the construction of the improvements.

(f) The county or a city imposing fees pursuant to this section may incur an interest-bearing indebtedness for the construction of bridge facilities or major thoroughfares. The sole security for repayment of the indebtedness shall be moneys in planned bridge facility or major thoroughfares funds. A city or county imposing fees pursuant to this section may enter into joint exercise of powers agreements with other local agencies imposing fees pursuant to this section, for the purpose of, among others, jointly exercising as a duly authorized original power established by this section, in addition to those through a joint exercise of powers agreement, those powers authorized in Chapter 5 (commencing with Section 31100) of Division 17 of the Streets and Highways Code for the purpose of constructing bridge facilities and major thoroughfares in lieu of a tunnel and appurtenant facilities, and, notwithstanding Section 31200 of the Streets and Highways Code, may acquire by dedication, gift, purchase, or eminent domain, any franchise, rights, privileges, easements, or other interest in property, either real or personal, necessary therefor on segments of the state highway system, including, but not limited to, those segments of the state highway system eligible for federal participation pursuant to Title 23 of the United States Code.

An entity constructing bridge facilities and major thoroughfares pursuant to this section shall design and construct the bridge facilities and major thoroughfares to the standards and specifications of the Department of Transportation then in effect, and may, at any time, transfer all or a portion of the bridge facilities and major thoroughfares to the state subject to the terms and conditions as shall be satisfactory to the Director of the Department of Transportation. Any of these bridge facilities and major thoroughfares shall be designated as a portion of the state highway system prior to its transfer.

The participants in a joint exercise of powers agreement may also exercise as a duly authorized original power established by this section the power to establish and collect toll charges only for paying for the costs of construction of the major thoroughfare for which the toll is charged and for the costs of collecting the tolls, except that a joint powers agency, which is the lending agency, may, notwithstanding subdivision (c), make toll revenues and fees imposed pursuant to this section available to another joint powers agency, which is the borrowing agency, established for the purpose of designing, financing, and constructing coordinated and interrelated major thoroughfares, in the form of a subordinated loan to pay for the cost of construction and toll collection of major thoroughfares other than the major thoroughfares for which the toll or fee is charged, if the lending agency has complied with all applicable laws, including Chapter 5 (commencing with Section 66000) of Division 1, and if the borrowing agency is required to pay interest on the loan to the lending agency at a rate equal to the interest rate charged on funds loaned from the Pooled Money Investment Account. Prior to executing the loan, the lending agency shall make all the following findings:

(1) The major thoroughfare for which the toll or fee is charged will benefit from the construction of the major thoroughfare to be constructed by the borrowing agency or will benefit financially by a sharing of revenues with the borrowing agency.

(2) The lending agency will possess adequate financial resources to fund all costs of construction of existing and future projects that it plans to undertake prior to the final maturity of the loan, after funding the loan, and taking into consideration its then existing funds, its present and future obligations, and the revenues and fees it expects to receive.

(3) The funding of the loan will not materially impair its financial condition or operations during the term of the loan.

Major thoroughfares from which tolls are charged shall utilize the toll collection equipment most capable of moving vehicles expeditiously and efficiently, and which is best suited for that purpose, as determined by the participants in the joint exercise of powers agreement. However, in no event shall the powers authorized in Chapter 5 (commencing with Section 31100) of Division 17 of the Streets and Highways Code be exercised unless a resolution is first adopted by the legislative body of the agency finding that adequate funding for the portion of the cost of constructing those bridge facilities and major thoroughfares not funded by the development fees collected by the agency is not available from any federal, state, or other source. Any major thoroughfare constructed and operated as a toll road pursuant to this section shall only be constructed parallel to other public thoroughfares and highways.

(g) The term "construction," as used in this section, includes design, acquisition of rights-of-way, and actual construction, including, but not limited to, all direct and indirect environmental, engineering, accounting, legal, administration of construction contracts, and other services necessary therefor. The term "construction" also includes reasonable general agency administrative expenses, not exceeding three hundred thousand dollars ($300,000) in any calendar year, after January 1, 1986, as adjusted annually for any increase or decrease in the Consumer Price Index of the Bureau of Labor Statistics of the United States Department of Labor for all Urban Consumers, Los Angeles-Long Beach-Anaheim, California (1967=100), as published by the United States Department of Commerce, by each agency created pursuant to Article 1 (commencing with Section 6500) of Chapter 5 of Division 7 of Title 1 for the purpose of constructing bridges and major thoroughfares. "General agency administrative expenses" means those office, personnel, and other customary and normal expenses associated with the direct management and administration of the agency, but not including costs of construction.

(h) Fees paid pursuant to an ordinance adopted pursuant to this section may be utilized to defray all direct and indirect financing costs related to the construction of the bridges and major thoroughfares by the joint powers agency. Because the financing costs of bridges and major thoroughfares for which a toll charge shall be established or collected represent a necessary element of the total cost of those bridges and major thoroughfares, the joint powers agency constructing those facilities may include a charge for financing costs in the calculation of the fee rate. The charge shall be based on the estimated financing costs of any eligible portion of the bridges and major thoroughfares for which tolls shall be collected. The eligible portion shall be any or all portions of the major thoroughfare for which a viable financial plan has been adopted by the joint powers agency on the basis of revenues reasonably expected by the joint powers agency to be available to the thoroughfare, after consultation with representatives of the fee payers. For purposes of calculating the charge, financing costs shall include only reasonable allowances for payments and charges for principal, interest, and premium on indebtedness, letter of credit fees and charges, remarketing fees and charges, underwriters’ discount, and other costs of issuance, less net earnings on bridge and major thoroughfare funds by the joint powers agency prior to the opening of the facility to traffic after giving effect to any payments from the fund to preserve the federal income tax exemption on the indebtedness. For purposes of calculating the charge for financing costs in the calculation of the fee rate only, financing costs shall not include any allowance for the cost of any interest paid on indebtedness with regard to each eligible portion after the estimated opening of the portion to traffic as established by the joint powers agency. Any and all challenges to any financial plan or financing costs adopted or calculated pursuant to this section shall be governed by subdivision (k).

(i) Nothing is this section shall be construed to preclude the County of Orange or any city within that county from providing funds for the construction of bridge facilities or major thoroughfares to defray costs not allocated to the area of benefit.

(j) Any city within the County of Orange may require the payment of fees in accordance with this section as to any property in an area of benefit within the city’s boundaries, for facilities shown on its general plan or the county’s general plan, whether the facilities are situated within or outside the boundaries of the city, and the county may expend fees for facilities or portions thereof located within cities in the county.

(k) The validity of any fee required pursuant to this section shall not be contested in any action or proceeding unless commenced within 60 days after recordation of the resolution described in paragraph (3) of subdivision (b). The provisions of Chapter 9 (commencing with Section 860) of Title 10 of Part 2 of the Code of Civil Procedure shall be applicable to any such action or proceeding. This subdivision shall also apply to modifications of fee programs.

(l) If the County of Orange and any city within that county have entered into a joint powers agreement for the purpose of constructing the bridges and major thoroughfares referred to in Sections 50029 and 66484.3, and if a proposed change of organization or reorganization includes any territory of an area of benefit established pursuant to Sections 50029 and 66484.3, within a successor local agency, the local agency shall not take any action that would impair, delay, frustrate, obstruct, or otherwise impede the construction of the bridges and major thoroughfares referred to in this section.

(m) Nothing in this section prohibits the succession of all powers, obligations, liabilities, and duties of any joint powers agency created pursuant to subdivision (l) to an entity with comprehensive countywide transportation planning and operating authority which is statutorily created in the County of Orange and which is statutorily authorized to assume those powers, obligations, liabilities, and duties.

(Added by Stats. 1984, Ch. 708. Effective August 23, 1984; Amended by Stats. 1985, Ch. 195. Effective July 9, 1985; Amended by Stats. 1986, Ch. 839; Amended by Stats. 1987, Ch. 1175. Effective September 26, 1987; Amended by Stats. 1987, Ch. 1349; Amended by Stats. 1987, Ch. 1402. Operative January 1, 1988; Amended by Stats. 1990, Ch. 1567.)

Note: Stats. 1984, Ch. 708, also reads:

SEC. 2. The Legislature finds and declares that unique circumstances which exist in the County of Orange dictate the necessity of providing an alternative procedure for that county and the cities within that county, as set forth in Section 1 of this act, and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution.

 

66484.5. Fee for groundwater recharge

(a) The legislative body of a local agency may adopt an ordinance requiring the payment of a fee as a condition of approval of a subdivision requiring a final or parcel map, or as a condition of issuing a building permit in an area of benefit under a groundwater recharge facility plan adopted as provided in this section, for the purpose of constructing recharge facilities for the replenishment of the underground water supply in that area of benefit. The ordinance may require payment of fees pursuant to this section if, at the time of payment, all of the following requirements are satisfied:

(1) A groundwater recharge facility plan for the area to be benefited has been adopted by the legislative body of the local agency. The legislative body shall not adopt the plan until it has given notice to, and consulted with, the water agency then obligated to furnish water to the area to be benefited and the water agency has formally and in writing approved the plan.

(2) The ordinance has been in effect for a period of at least 30 days prior to the filing of the tentative map, parcel map if no tentative map is required, or the application for a building permit.

(3) The ordinance provides that before any groundwater recharge facility plan is adopted there will be a public hearing held by the legislative body for the proposed area of benefit.

Notice of the hearing on a proposed area of benefit shall be given pursuant to Section 65091 and shall include preliminary information concerning the groundwater recharge facility plan, including the proposed boundaries of the area of benefit, the availability of surface water, the planned facilities for the area of benefit, estimated costs, and the proposed method of fee apportionment.

Written notice of the public hearing shall be given by personal service or mail to the water agency responsible for furnishing water to the area of benefit involved in the hearing prior to or at the time notice is given by mail or by publication and posting. The proposal contained in the mailed, published, or posted notice shall be jointly prepared and agreed upon by the local agency and the water agency before that notice is given. The water agency may participate in the hearings.

(4) The ordinance provides that the groundwater recharge facility plan shall be established at the public hearing and, if approved, adopted by the legislative body. The plan shall include the boundaries of the area of benefit, the availability of surface water, the planned facilities for the area of benefit and the estimated cost thereof, a fair method of allocating the costs within the area of benefit, and the apportionment of fees within the area. The plan, as adopted by the local agency and approved by the water agency, shall be incorporated in a resolution of the legislative body and a certified copy of the plan shall be recorded with the county recorder. The apportioned fees shall be applicable to all property within the area of benefit and shall be payable as a condition of approval of a final map or a parcel map or as a condition of issuing a building permit for the property or portions of the property. Where the area of benefit includes lands not otherwise subject to the payment of fees pursuant to this section, the legislative body shall make provision for payment of the share of improvement costs apportioned to that land by other means.

(5) The ordinance provides that if, within the time when protests may be filed under the provisions of the ordinance, there is a written protest, filed with the clerk of the legislative body, by the owners of more than one-half of the area of the property to be benefited by the improvement, and sufficient protests are not withdrawn so as to reduce the area represented to less than one-half of the property to be benefited, then the proposed proceedings shall be abandoned, and the legislative body shall not, for one year from the filing of that written protest, commence or carry on any proceedings for the same improvement or acquisition under the provisions of this section.

(b) Any protests may be withdrawn in writing by the owner who made the protest, at any time prior to the conclusion of a public hearing held pursuant to the ordinance.

(c) If any majority protest is directed against only a portion of the improvement, then all further proceedings under this section as to that portion of the improvement so protested against shall be barred for a period of one year. The legislative body, however, may commence new proceedings which do not include the area, acquisitions, or improvements which were the subject of the successful protest. Nothing in this section prohibits the legislative body, within that one-year period, from commencing and carrying on new proceedings for that portion of the improvements so protested against if it finds, by the affirmative vote of four-fifths of its members, that the owners of more than one-half of the area of the property to be benefited are in favor of going forward with that portion of the improvement or acquisition.

(d) Nothing in this section precludes the processing and recordation of maps in accordance with other provisions of this division if proceedings are abandoned.

(e) Subsequent to the adoption of a plan, the local agency may itself construct, operate, and maintain the groundwater recharge facilities, or it may designate the water agency furnishing the water or designate or create another agency to do all or any one of these things as authorized by law. In the event any agency other than the local agency adopting such ordinances is so designated, the services so rendered shall be pursuant to a written agreement entered into between the local agency and the other agency.

(f) Fees paid pursuant to an ordinance adopted pursuant to this section shall be deposited in a planned recharge facility fund. A fund shall be established for each area of benefit. Money in the fund shall be expended solely for the construction or reimbursement for construction of the improvement serving the area to be benefited.

The fees shall not be expended to reimburse the cost of recharge facilities in existence prior to the adoption of the groundwater recharge facility plan for that area.

(g) An ordinance adopted pursuant to this section may provide for the acceptance of considerations in lieu of the payment of fees.

(h) A local agency imposing fees pursuant to this section may advance money from its general fund to pay the cost of constructing the improvements and may reimburse the general fund for those advances from planned recharge facility funds collected to finance the construction of these improvements.

(i) A local agency imposing fees pursuant to this section may incur an interest-bearing indebtedness for the construction of recharge facilities. However, the sole security for repayment of that indebtedness shall be money in planned recharge facility funds.

(j) Recharge facilities shall not be constructed unless the water agency approves the design of the facilities to be constructed and has reached an agreement with the local agency establishing the terms and conditions under which the water will be furnished. If the water agency finds that the facilities have been constructed in accordance with the approved design, the agency shall furnish water for the groundwater recharge facilities.

(k) If the water agency is an irrigation district or other entity obligated by law to apportion water among the landowners within the area of benefit, the water agency shall receive credit upon the obligation for any water delivered for groundwater recharge under the agreement and shall be relieved of any further obligation to deliver the amount of water for which it has received such credit to the landowners or lands within that area.

(l) Nothing contained in this section entitles a local agency to collect a fee from a landowner who presently receives and continues to receive and use the landowner’s pro rata share of surface water from the agency responsible for that area or from a landowner who has not applied for approval of a final or parcel map or a building permit.

(m) A credit for fees paid as authorized by this section shall be applied against any assessment levied by the local agency to construct the planned recharge facilities.

(n) The term "construction," as used in this section, includes design, acquisition of land or easements, administration of construction contracts, and actual construction.

(o) The term "water agency," as used in this section, means the public or other entity that will furnish water for the operation and use of a recharge facility under a groundwater recharge facility plan adopted by a local agency pursuant to this section.

(p) Nothing in this section precludes a county or city from providing funds for the construction of recharge facilities to defray costs not allocated to the area of benefit.

(Amended by Stats. 1984, Ch. 1009.)

 

 

Article 6. Reimbursement

 

66485. Authority to require dedication of improvements

There may be imposed by local ordinance a requirement that improvements installed by the subdivider for the benefit of the subdivision shall contain supplemental size, capacity, number, or length for the benefit of property not within the subdivision, and that those improvements be dedicated to the public. Supplemental length may include minimum sized offsite sewer lines necessary to reach a sewer outlet in existence at that time.

(Amended by Stats. 1983, Ch. 704.)

 

66486. Agreement for reimbursement

In the event of the installation of improvements required by an ordinance adopted pursuant to Section 66485, the local agency shall enter into an agreement with the subdivider to reimburse the subdivider for that portion of the cost of those improvements, including an amount attributable to interest, in excess of the construction required for the subdivision.

(Amended by Stats. 1983, Ch. 704.)

 

66487. Revenues for reimbursement

In order to pay the costs as required by the reimbursement agreement, the local agency may:

(a) Collect from other persons, including public agencies, using such improvements for the benefit of real property not within the subdivision, a reasonable charge for such use.

(b) Contribute to the subdivider that part of the cost of the improvements that is attributable to the benefit of real property outside the subdivision and levy a charge upon the real property benefited to reimburse itself for such cost, together with interest thereon, if any, paid to the subdivider.

(c) Establish and maintain local benefit districts for the levy and collection of such charge or costs from the property benefited.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66488. Use of drainage/sewer plan by other agencies

Any local agency within a local drainage or sanitary sewer area may adopt the plan and map designated in Section 66483 and impose a reasonable charge on property within the area which, in the opinion of the legislative body, is benefited by such drainage or sanitary sewer facilities. The charge collected must be paid to the local agency or subdivider constructing such drainage or sanitary sewer facilities, and any local agency within the drainage or sanitary sewer area may enter into a reimbursement agreement with the subdivider.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66489. Area of benefit

Any local agency may establish an area of benefit pursuant to Section 66484 and may impose a reasonable charge on property within the area which in the opinion of the legislative body, is benefited by the construction of the bridge or major thoroughfare. The charge collected shall be paid to the local agency or subdivider constructing the bridge, and any local agency having jurisdiction over any property which, in the opinion of the legislative body, is benefited by the construction of the bridge or major thoroughfare may enter into a reimbursement agreement with the subdivider.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

 

Article 7. Soils Report

 

66490. Preliminary report

A preliminary soils report, prepared by a civil engineer registered in this state, and based upon adequate test borings, shall be required for every subdivision for which a final map is required by this division and may be required by local ordinance for other subdivisions.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975.)

 

66491. Optional requirements waiver

With respect to the soils report, a local ordinance may provide that:

(a) The preliminary soils report may be waived if the local agency shall determine that, due to the knowledge it has as to the soils qualities of the soils of the subdivision, no preliminary analysis is necessary.

(b) The preliminary soils report may be submitted to the city engineer or county engineer for review. The city engineer or county engineer may review the preliminary soils report and may require additional information or reject the report if it is found to be incomplete, inaccurate, or unsatisfactory.

(c) If the preliminary soils report indicates the presence of critically expansive soils or other soils problems which, if not corrected, would lead to structural defects, a soils investigation of each lot in the subdivision may be required.

(d) If the preliminary soils report indicates the presence of rocks or liquids containing deleterious chemicals which, if not corrected, could cause construction materials such as concrete, steel, and ductile or cast iron to corrode or deteriorate, a soils investigation of each potentially affected lot in the subdivision may be required.

(e) Any soils investigation required pursuant to this section shall be done by a civil engineer registered in this state, who shall recommend the corrective action which is likely to prevent structural damage to each structure proposed to be constructed in the area where the soils problem exists.

(f) The local agency may approve the subdivision or portion thereof where soils problems described in subdivision (c) or (d) exist if it determines that the recommended action is likely to prevent structural damage to each structure to be constructed, and as a condition to the issuance of any building permit may require that the approved recommended action be incorporated in the construction of each structure.

(Added by Stats. 1974, Ch. 1536. Effective March 1, 1975; Amended by Stats. 1989, Ch. 133; Amended by Stats. 1991, Ch. 668.)

 

 

Article 8. Taxes and Assessments

 

66492. Certificates: tax and assessment liens

Prior to the filing of the final map or parcel map with the legislative body, the subdivider shall, in accordance with procedures established by the county, file with the county recorder of the county in which any part of the subdivision is located, a certificate or statement from the official computing redemptions in any public agency in which any part of the subdivision is located, showing that, according to the records of that office, there are no liens against the subdivision or any part thereof for unpaid, state, county, municipal or local taxes or special assessments collected as taxes, except taxes or special assessments not yet payable.

This section shall not be applicable to amending maps filed in accordance with the provisions of Section 66469.

(Amended by Stats. 1983, Ch. 1224; Amended by Stats. 1985, Ch. 1199; amended by Stats. 1987, Ch. 982; Amended by Stats. 1993, Ch. 906. Effective October 8, 1993.)

 

66493. Security for payment of taxes/special assessments

(a) Whenever any part of the subdivision is subject to a lien for taxes or special assessments collected as taxes which are not yet payable, the final map or parcel map shall not be recorded until the owner or subdivider does both of the following:

(1) Files with the clerk of the board of supervisors of the county wherein any part of the subdivision is located a certificate or statement prepared by the appropriate state or local official giving his or her estimate of those taxes or assessments.

(2) Executes and files with the clerk of the board of supervisors of the county wherein any part of the subdivision is located, security conditioned upon the payment of all state, county, municipal, and local taxes and the current installment of principal and interest of all special assessments collected as taxes, which at the time the final map is recorded are a lien against the property, but which are not yet payable.

(b) If the land being subdivided is a portion of a larger parcel shown on the last preceding tax roll as a unit, the security for payment of taxes need be only for the sum which may be determined by the county to be sufficient to pay the current and delinquent taxes on the land being subdivided, together with all accrued penalties and costs if those taxes have been or are allowed to become delinquent. Separate assessor’s parcel numbers shall be given to the portion of the larger parcel which is not within the proposed subdivision and to the parcel or parcels which are within the proposed subdivision.

If the land being subdivided is tax-defaulted, it may be redeemed without the redemption of the remainder of the larger parcel of which it is a part pursuant to the Revenue and Taxation Code as if it were held in ownership separate from and other than the ownership of the remainder.

(c) Whenever land subject to a special assessment or bond which may be paid in full is divided by the line of a lot or parcel of the subdivision, that assessment or bond shall be paid in full; security shall be filed with the clerk of the board of supervisors, payable to the county as trustee for the assessment bondholders for the payment of the special assessment or bond; or the responsibility for payment of the assessment shall be certified as segregated pursuant to subdivision (d).

(d) Whenever land subject to a special assessment for payment of a bond would be divided by the line of a lot or parcel of a subdivision, and the special assessment is not paid in full or secured pursuant to subdivision (c), the final map or parcel map shall not be recorded until the owner or subdivider files with the clerk of the board of supervisors of the county a certificate prepared by the clerk of the legislative body that created the assessment district. The certificate shall certify that the legislative body has determined that provision has been made for segregation of the responsibility of each of the proposed new parcels for a portion of the assessment payment obligation i